Beighton Construction - Our Logo / Link to home page.

Chesterfield Coach Station

This high profile scheme to provide a new coach station for Chesterfield was built for Chesterfield Borough Council.

 

The works involved the construction of a reinforced concrete retaining wall clad with locally sourced masonry, supporting the raft foundation for the main building. The building superstructure consisting of a timber frame, clad with brickwork and timber panelling was designed incorporating ‘green’ materials where possible, with natural ventilation using a wind catcher system, sheep’s wool insulation and solar panels providing a portion of the building running costs.

 

Internally finished to a high standard using custom made joinery furniture the project was completed on schedule and within budget.

 

Contract: Chesterfield Coach Station

Engineer: Chesterfield Borough Council

Carried out: October 2004 to April 2005

 
 

Website Navigation: Home | About Us | Projects | Contact Us

Beighton Construction Ltd | 58 Dunston Road, Chesterfield, Derbyshire, S41 8XA

Email: beighton@beighton-construction.co.uk | Phone: 01246 451098


 

 

Beighton Construction Ltd | Company number 01015616 | Registered Office: 58 Dunston Road, Chesterfield, Derbyshire, S41 8XA

Website content ©2021-2022 Beighton Construction Ltd | Website Terms

Website design by Pocket M ©2004-2022